
Floor cleaners are certified as machines, and their batteries are certified as packs. A scrubber may be a household appliance or a commercial machine; a robot vacuum is an automatic battery-operated cleaner; a robot mop adds water. The correct standard set depends on the machine class, the market and the way the battery is charged. This paper maps the evidence chain and the tests that most often expose a weak NiMH design.
| Machine | Primary safety standard | Battery / charger | Notes |
|---|---|---|---|
| Household vacuum / robot vacuum | IEC 60335-2-2:2019 or 2026 | IEC 62133-1, IEC 60335-2-29 charger | Automatic cleaners and docks in scope |
| Household floor scrubber / wet scrubber | IEC 60335-2-10:2021 | IEC 62133-1, charger standard | Battery-operated appliances in scope |
| Commercial floor treatment, no traction | IEC 60335-2-67:2012 | IEC 62133-1, charger standard | Commercial use, risk assessment |
| Commercial floor treatment with traction | IEC 60335-2-72:2012 | IEC 62133-1, charger standard | Traction drive, ride-on or walk-behind |
| Robot mop / wet-dry robot | IEC 60335-2-2 and IEC 60335-2-10 as applicable | IEC 62133-1, IP rating | Water, cleaning agent, dock wash |
The classification is not cosmetic. A commercial scrubber may need a machinery risk assessment, emergency stop and braking performance that a household appliance does not. A robot vacuum's dock may be assessed under the appliance standard, but the dock's charger and mains input still need the charger and EMC evidence.
The cell performance layer uses IEC 61951-2:2017 + A1:2022: capacity, high-rate discharge, cycle life and storage. The pack safety layer uses IEC 62133-1:2017, with the 2026 edition checked for the destination market. The pack tests are external short, impact, crush, overcharge, forced discharge and thermal abuse. For a scrubber pack, the mechanical tests are particularly relevant because the pack is often a large, heavy block that can be dropped or struck during service.
| Test | Scrubber-specific concern | Robot-specific concern |
|---|---|---|
| External short | Large pack, high short-circuit current | Small pack, connector and dock pins |
| Impact / crush | Service drop, tank removal, floor impact | Fall from dock, furniture impact |
| Overcharge | Wrong charger, failed termination, hot ambient | Dock fault, charge while wet |
| Forced discharge | Weak cell in a long string | Small string, imbalance |
| Thermal abuse | Direct sunlight, hot floor, enclosure heat | Dock heater, blocked ventilation |
IEC 60335-2-10:2021 is the sixth edition for floor treatment machines and wet scrubbing machines. It aligns with IEC 60335-1:2020 and covers battery-operated appliances. The tests that matter most for a NiMH pack are heating, abnormal operation, charging, water ingress and mechanical strength.
| Test area | Typical method | Battery interaction |
|---|---|---|
| Normal heating | Continuous scrub at rated conditions | Pack temperature, connector heat, cell balance |
| Abnormal vacuum | Blocked squeegee or hose | Fan current, motor cooling, pack load |
| Brush stall | Locked brush or obstruction | Peak current, fuse, controller limit |
| Pump dry run | Empty tank, closed valve | Pump current, controller protection |
| Charging fault | Wrong charger, failed termination | Overcharge, cell heating, venting |
| Water spill | Spillage on machine and connector | Insulation, corrosion, seal integrity |

A ride-on or walk-behind commercial scrubber may be a machine under the EU Machinery Directive 2006/42/EC, now replaced in application by the Machinery Regulation (EU) 2023/1230 from 2027. The risk assessment covers crushing, trapping, steering, braking, emergency stop and battery isolation. Safety-related control functions may need ISO 13849 performance levels. The battery pack is part of the energy source and must be isolatable for maintenance.
| Hazard | Example | Evidence |
|---|---|---|
| Crushing / trapping | Ride-on machine against a wall or rack | Risk assessment, bumper, stop distance |
| Loss of traction | Ramp start or wet floor | Traction test, brake test, grade rating |
| Electrical | Battery isolation, charger inlet | Isolation device, IP rating, insulation test |
| Thermal | Pack enclosure in hot plant room | Temperature test, ventilation, derating |
| Maintenance | Pack replacement, water tank removal | Service procedure, lockout, weight limit |
Water ingress is the most common cause of scrubber pack failure in the field. IPX4 is a common minimum for splash; IPX6 may be specified for wash-down. The test must be performed with the pack installed and the connector mated, because the connector is often the path of ingress. EMC follows CISPR 14-1/-2 for the machine and charger; a battery pack alone has no intentional RF source, but the motor drives and charger do.
| Requirement | Standard | Scope |
|---|---|---|
| IP rating | IEC 60529 | Pack, connector, dock, control panel |
| Emission | CISPR 14-1 / EN 55014-1 | Motor drives, charger, electronics |
| Immunity | CISPR 14-2 / EN 55014-2 | ESD, surge, transient, RF |
| Vibration | IEC 60068-2-6 | Transport and machine vibration |
| Drop | IEC 60068-2-31 | Pack and machine handling |
| Thermal shock | IEC 60068-2-14 | Storage, shipping, wash-down |
A scrubber is often charged in a wet room or after wash-down. The charger interface and pack vent must handle condensation. A sealed pack that breathes through a vent can still accumulate water if the vent is submerged; a pack that is fully sealed can pressurize and leak at the seal. The design should define the vent location, the IP rating and the drying procedure. The charger should not start if the connector is wet or the pack temperature is outside the charge window.
| Water test | Method | Pass condition | Common failure |
|---|---|---|---|
| Splash | IPX4, oscillating spray | No harmful ingress | Connector gasket, vent path |
| Wash-down | IPX6, strong jet | No harmful ingress | Seal compression, latch area |
| Immersion (if claimed) | IPX7, defined depth/time | No harmful ingress | Vent, cable gland, connector |
| Condensation | Thermal cycling with humidity | No insulation failure | Breathable vent placement |

| Mode / market | Requirement | Evidence |
|---|---|---|
| Sea (IMDG) | UN 3496, Class 9 | Dangerous goods declaration, packaging |
| Air (IATA) | A199 “Not Restricted” when conditions met | Air waybill “Not Restricted” + A199 |
| EU | CE, EMC, battery regulation, machinery where applicable | Technical file, declaration, risk assessment |
| UK | UKCA, UK EMC, battery rules | Designated standards, declaration |
| USA | UL 1017 or UL 60335-2-67/2-72 as applicable | NRTL report, FCC for charger |
| Japan | PSE charger, appliance safety | PSE certificate, VCCI where applicable |
| Korea | KC safety and EMC | KC certificate |
| Australia | RCM, AS/NZS 60335-2-10 | RCM declaration |
| Audit item | Frequency | Record |
|---|---|---|
| Cell incoming | Every lot | Capacity, resistance, date code |
| Weld pull | Per shift sample | Force and nugget size |
| Pack capacity / resistance | 100% | Within tolerance |
| IP test | Per model per quarter | No ingress, connector mated |
| Charge termination | Per charger lot | Low/high temperature pass |
| Drop / vibration | Per model per quarter | No displacement or loss |
Floor scrubbers and robotic cleaners are certified through a combination of appliance safety, pack safety, water ingress, EMC, mechanical and transport evidence. The battery is not a separate accessory; it is part of the machine's energy and water system. A NiMH pack that passes IEC 62133-1 but fails the machine's water test is not certifiable, and a machine that passes the appliance test but ignores the dock pulse is not reliable. The next series moves outdoors to hedge trimmers and chainsaws, where stall torque and garden duty cycles dominate.
Buyer fact sheet
| Legal entity | Shenzhen Weijiang Battery Co., Ltd., trading as Weijiang Power |
| Founded | 2010, 16 years of NiMH battery manufacturing |
| Factory | Huizhou Shenzhou Super Power Technology Co., Ltd., Zhongkai High-tech Zone, Huizhou, Guangdong; 12,000 m2, 4 workshops |
| Capacity | 200,000 NiMH cells per day; 200+ staff including 11-20 R&D engineers and 10 QC inspectors |
| Product range | NiMH cells A, AA, AAA, SC, C, D, 9V, F, Sub-C, 4/5AA, 2/3A; custom NiMH packs; chargers; button and alkaline cells |
| Certifications | CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001:2015, ISO 14001, IATF 16949, IEC 62321, MSDS, UL, IEC 62133; 16 patents; UN38.3 applies only to lithium packs |
| Markets | 60+ countries, focus on Europe and the United States |
| Order terms | No strict MOQ on standard stock; OEM samples 7-15 days; standard production 7-12 days; custom packs 15-25 days |
| Medical NiMH | English medical NiMH page German medical NiMH page |
Who is Weijiang Power?
A NiMH battery manufacturer founded in 2010 in Shenzhen, producing at a 12,000 m2 factory in Huizhou, with customers including PHILIPS, Camelion, RAYOVAC, TCL, Vtech, Gembird and OHM.
What can Weijiang Power supply?
Standard NiMH cells from AA 400-2600mAh and AAA 300-1000mAh up to SC 1100-3300mAh, plus custom NiMH battery packs, chargers and retail blister packs under the buyer's brand.
Which certificates are available for EU and US buyers?
CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001, ISO 14001, IATF 16949, IEC 62321, MSDS, UL and IEC 62133, with 16 patents; UN38.3 applies only to lithium packs.
What is the minimum order and lead time?
Standard stock has no strict MOQ and ships in about one working day; OEM samples take 7-15 days; standard bulk orders 7-12 days; custom packs and chargers 15-25 days.
How do I get a sample or a quote?
Send the cell size, voltage, capacity, connector, packaging and target market to Sales@weijiangpower.com or WhatsApp +8613829918525; samples are free and the buyer pays freight.
Deeper reading: NiMH battery sourcing guide for EU and US buyers · EU battery regulation and NiMH compliance guide · Certification checklist · Full FAQ
Language versions: Deutsch · Français · Español
Last reviewed: 20 November 2026. Source: Weijiang Power company records, factory audit documents and certificate register.