The pack is sized by the shift, not by the motor label. A floor scrubber may run for two hours with a brush, vacuum, pump and traction load that change every minute. A robot may clean for ninety minutes and then draw a dock pulse far above its cleaning power. This paper applies a six-step method to both classes and gives worked examples with explicit assumptions.
Start with a table of phases: scrub, transport, dock and idle. For each phase, list the simultaneous loads and their duration. This prevents the common error of adding every motor's rated power as if all run together all the time.
| Phase | Traction | Brush | Vacuum | Pump | Electronics | Duration |
|---|---|---|---|---|---|---|
| Scrub pass | 3–6 A | 5–10 A | 8–15 A | 0.5–2 A | 0.3–0.8 A | 20–60 min |
| Transport | 4–8 A | 0 | 0–4 A | 0 | 0.3–0.8 A | 2–10 min |
| Dock / clean | 0 | 0–3 A | 0–5 A | 0–3 A | 0.3–0.8 A | 10–120 min |
| Idle | 0 | 0 | 0 | 0 | 0.05–0.3 A | Hours |
The current values are illustrative for a 24 V walk-behind scrubber. The actual values should be measured on a prototype or taken from motor datasheets with realistic efficiencies. Record the simultaneity: brush and vacuum usually run together; traction may be intermittent; the pump may be pulsed.
Voltage follows the machine's motor and controller design. A 24 V scrubber normally uses a 20S NiMH pack; a 36 V machine uses 30S. A robot may use 10S or 12S. The full-charge and cutoff windows must be checked against the controller's input range and the motor's safe operating limits.
| Machine | Configuration | Nominal | Full charge | Cutoff | Design note |
|---|---|---|---|---|---|
| Small robot | 10S | 12.0 V | 14.0–14.5 V | 10.0 V | Compact, low power, dock charging |
| Robot / compact scrubber | 12S | 14.4 V | 16.8–17.4 V | 12.0 V | Higher voltage, lower current |
| Walk-behind scrubber | 20S | 24.0 V | 28.0–29.0 V | 20.0 V | Dominant commercial class |
| Ride-on scrubber | 30S | 36.0 V | 42.0–43.5 V | 30.0 V | Higher power, more cells, balancing |
Higher voltage reduces current for the same power, which reduces cable and connector loss. It also increases the number of cells in series, the cost of balancing and the risk of a weak cell ending the discharge early. The choice is a system optimization, not a voltage fashion.

Commercial scrubber packs often use high-rate Sub-C or cylindrical NiMH cells. The parallel count is set by the current per cell and the thermal path, not by the desire for a round capacity number.
| Cell | Capacity | Suggested continuous current per cell | Parallel strings for 20 A | Comment |
|---|---|---|---|---|
| Sub-C high-rate | 2.0–3.0 Ah | 5–8 A | 3–4 | Good thermal mass, proven in scrubbers |
| AA high-rate | 1.2–2.0 Ah | 3–5 A | 4–7 | More strings, more assembly complexity |
| D-size NiMH | 2.0–4.0 Ah | 8–15 A | 2 | High current, larger and heavier |
A 20S3P Sub-C pack has 60 cells, which is heavy and expensive. A 20S2P D-size pack has 40 cells but a larger footprint. The designer must balance cell count, pack volume, serviceability and cost. The pack's thermal path should be designed with cell spacing and, where needed, a fan or a conductive path to the enclosure.

Calculate the energy per phase, sum it, then divide by the derated pack energy. The result is the number of packs or the capacity per pack needed for a shift.
Eshift = Σ (Pphase × tphase) and Crequired = Eshift / (Vnom × kderate)
| Phase | Power | Duration | Energy |
|---|---|---|---|
| Scrub pass | 180 W | 45 min | 135 Wh |
| Transport | 100 W | 10 min | 16.7 Wh |
| Dock / clean | 80 W | 15 min | 20 Wh |
| Idle | 5 W | 2 h | 10 Wh |
| Total | 181.7 Wh | ||
If the derating chain is 0.62, the required nameplate energy is 181.7 / 0.62 = 293 Wh. At 24 V, that is 12.2 Ah. A 20S 12.0 Ah pack is large; many scrubbers use two packs or a larger capacity. The example shows why shift energy, not motor power, sets the pack size.
| Derating factor | Illustrative value | Reason |
|---|---|---|
| Rate | 0.85–0.95 | High-rate discharge and voltage cutoff |
| Temperature | 0.85–0.95 | Cold or hot ambient |
| Age | 0.80–0.95 | Capacity fade and resistance growth |
| Cutoff / imbalance | 0.90–0.97 | Weakest cell ends discharge |
| Wiring / converter | 0.90–0.97 | I²R and DC/DC losses |
The pack resistance includes cells, welds, nickel strip, wiring, connector and fuse. At 20 A, a 100 mΩ pack drops 2.0 V and heats 40 W. A 50 mΩ pack drops 1.0 V and heats 20 W. The difference is visible to the operator as voltage sag and to the service team as connector temperature.
| Current | Sag at 60 mΩ | Sag at 100 mΩ | Heat at 60 mΩ | Heat at 100 mΩ |
|---|---|---|---|---|
| 5 A | 0.30 V | 0.50 V | 1.5 W | 2.5 W |
| 10 A | 0.60 V | 1.00 V | 6 W | 10 W |
| 15 A | 0.90 V | 1.50 V | 13.5 W | 22.5 W |
| 20 A | 1.20 V | 2.00 V | 24 W | 40 W |
| 25 A | 1.50 V | 2.50 V | 37.5 W | 62.5 W |
The connector and fuse should be rated for the maximum simultaneous load, not the scrub-pass average. The self-empty dock pulse and the traction ramp can be higher than the cleaning current. A connector with a 10 mΩ contact pair adds 4 W of heat at 20 A, which is enough to warm a sealed enclosure over a shift.
A scrubber pack lives in a wet environment. The enclosure, connector, charger interface and condensation path are part of the electrical design. IPX4 is a common minimum for splash; wash-down areas may require IPX6, but the rating must be verified with the pack installed and the connector mated. Cleaning agents can attack seals and plating; compatibility testing is part of the pack qualification.
Assume a 20S NiMH pack, 4.0 Ah Sub-C cells, 96 Wh nameplate, a derating chain of 0.62 and an average scrub power of 120 W. Usable energy is 59.5 Wh, giving about 29.8 minutes at 120 W. To reach a 60-minute scrub shift, the designer needs about 8.0 Ah (192 Wh nameplate) or two 4.0 Ah packs. The example also shows why a 4.0 Ah pack is often a battery for a small machine, not a full-shift commercial scrubber.
| Parameter | Value | Comment |
|---|---|---|
| Configuration | 20S2P Sub-C, 4.0 Ah | 24 V nominal, 96 Wh |
| Derated energy | 59.5 Wh | 0.62 chain |
| Average scrub power | 120 W | Brush + vacuum + pump + traction |
| Runtime | ≈ 29.8 min | 59.5 Wh / 120 W |
| 60-min requirement | ≈ 8.0 Ah | 192 Wh nameplate × 0.62 = 119 Wh |
| Peak current | ≈ 22 A | Brush start + vacuum + traction |
A 12S 2.5 Ah NiMH robot pack has 36 Wh nameplate. Derated by 0.60, it delivers 21.6 Wh. If the robot averages 18 W while cleaning, runtime is about 72 minutes. A dock self-empty pulse of 400 W at 14.4 V draws 27.8 A for 15 seconds, which is a pack and connector pulse requirement, not an energy requirement. The pack must be tested for that pulse even though it contributes little to the shift energy.
| Parameter | Value | Comment |
|---|---|---|
| Configuration | 12S1P, 2.5 Ah | 14.4 V nominal, 36 Wh |
| Derated energy | 21.6 Wh | 0.60 chain |
| Average cleaning power | 18 W | Fan + drive + brush + electronics |
| Runtime | ≈ 72 min | 21.6 Wh / 18 W |
| Dock pulse | 400 W, 15 s | ≈ 27.8 A at 14.4 V |
| Pack pulse check | Voltage sag and temperature | Connector and fuse rating |
Sizing a NiMH pack for a floor scrubber or robotic cleaner is an exercise in phase-based energy accounting. The brush and vacuum set the continuous load, traction sets the peak, the pump is a small but constant draw, and the dock can set a pulse that the connector must survive. A pack that passes the energy calculation but fails the pulse or water test is not a finished design. The next paper turns the design into a certification plan.
Buyer fact sheet
| Legal entity | Shenzhen Weijiang Battery Co., Ltd., trading as Weijiang Power |
| Founded | 2010, 16 years of NiMH battery manufacturing |
| Factory | Huizhou Shenzhou Super Power Technology Co., Ltd., Zhongkai High-tech Zone, Huizhou, Guangdong; 12,000 m2, 4 workshops |
| Capacity | 200,000 NiMH cells per day; 200+ staff including 11-20 R&D engineers and 10 QC inspectors |
| Product range | NiMH cells A, AA, AAA, SC, C, D, 9V, F, Sub-C, 4/5AA, 2/3A; custom NiMH packs; chargers; button and alkaline cells |
| Certifications | CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001:2015, ISO 14001, IATF 16949, IEC 62321, MSDS, UL, IEC 62133; 16 patents; UN38.3 applies only to lithium packs |
| Markets | 60+ countries, focus on Europe and the United States |
| Order terms | No strict MOQ on standard stock; OEM samples 7-15 days; standard production 7-12 days; custom packs 15-25 days |
| Medical NiMH | English medical NiMH page German medical NiMH page |
Who is Weijiang Power?
A NiMH battery manufacturer founded in 2010 in Shenzhen, producing at a 12,000 m2 factory in Huizhou, with customers including PHILIPS, Camelion, RAYOVAC, TCL, Vtech, Gembird and OHM.
What can Weijiang Power supply?
Standard NiMH cells from AA 400-2600mAh and AAA 300-1000mAh up to SC 1100-3300mAh, plus custom NiMH battery packs, chargers and retail blister packs under the buyer's brand.
Which certificates are available for EU and US buyers?
CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001, ISO 14001, IATF 16949, IEC 62321, MSDS, UL and IEC 62133, with 16 patents; UN38.3 applies only to lithium packs.
What is the minimum order and lead time?
Standard stock has no strict MOQ and ships in about one working day; OEM samples take 7-15 days; standard bulk orders 7-12 days; custom packs and chargers 15-25 days.
How do I get a sample or a quote?
Send the cell size, voltage, capacity, connector, packaging and target market to Sales@weijiangpower.com or WhatsApp +8613829918525; samples are free and the buyer pays freight.
Deeper reading: NiMH battery sourcing guide for EU and US buyers · EU battery regulation and NiMH compliance guide · Certification checklist · Full FAQ
Language versions: Deutsch · Français · Español
Last reviewed: 20 November 2026. Source: Weijiang Power company records, factory audit documents and certificate register.