Nov.2026 24
Views: 82
Selecting and Sizing Sealed NiMH Packs for Warehouse AGVs and AMRs: Load Audit, Voltage, Capacity, Opportunity Charging and Thermal Design
Introduction
A six-step method for sizing sealed NiMH packs for warehouse AGVs and AMRs: mission load audit, 20S/40S voltage architecture, cell format, capacity derating, resistance and thermal design, charging and swap.
Details

Selecting and Sizing Sealed NiMH Packs for Warehouse AGVs and AMRs: Load Audit, Voltage, Capacity, Opportunity Charging and Thermal Design

An AGV pack is sized for the shift, the ramp and the dock. The shift sets the energy; the ramp and lift set the peak; the dock sets the charge acceptance and the thermal cycle. This paper applies a six-step method to warehouse AGVs and AMRs, with worked numbers that separate nameplate capacity from usable capacity.

Key facts at a glance

  • Start with a mission load audit, not a motor label. Average power sets energy; peak power sets connector and fuse.
  • Choose the series count for voltage, the parallel count for current. A 40S pack is not a 20S pack with twice the runtime.
  • Check the full-charge voltage against the controller. 40S NiMH reaches about 58 V, above many 48 V lithium limits.
  • Derate NiMH for rate, temperature, age and cutoff. A realistic planning chain is about 0.55–0.65.
  • Heat is the limiting factor at 30 A and above. A 48 V 100 Ah pack can dissipate over 100 W continuously.
  • NiMH is not an opportunity-charge chemistry by default. It needs periodic full charge and balancing; 24/7 fleets should plan a swap.

Step 1: Audit the mission load

The load audit should record the current and duration of every phase, not just the average. A mission that looks light on energy can still have a 70 A ramp start that destroys a marginal connector.

Mission phase Typical duration Current at 48 V Current at 24 V Energy share
Idle / standby 20–40% of shift 1–3 A 2–6 A Low, but continuous
Acceleration 1–3 s per move 30–50 A 60–100 A Small energy, high stress
Cruise 40–60% of move time 5–15 A 10–30 A Dominant energy
Ramp start 2–5 s 40–70 A 80–140 A Small energy, highest stress
Lift / lower 3–10 s per lift 5–20 A 10–40 A Moderate energy
Steering Seconds per turn 2–10 A 4–20 A Small energy, peak additive
Dock / charge 10–60 min Charge current Charge current Not a discharge load

The values are illustrative. The important discipline is to log current and time together, then compute RMS current for thermal design and average power for energy. A peak that lasts two seconds heats the connector but does not size the battery energy; a 2 A house load that runs for 16 hours does.

Step 2: Choose the voltage architecture

Platform Series count Nominal Full charge Cutoff Controller check
24 V small AMR 20S 24.0 V 29.0 V 20.0 V Absolute max above 30 V
48 V AMR 40S 48.0 V 58.0 V 40.0 V Absolute max above 60 V
48 V legacy AGV 40S 48.0 V 58.0 V 40.0 V Original 48 V lead-acid window is often 54–56 V
72 V heavy platform 60S 72.0 V 87.0 V 60.0 V High-voltage practice and insulation

The series count is fixed by the controller and charger, not by the cell. A 40S NiMH pack has 40 cells in series; the parallel strings then set capacity and current. If the controller cannot accept 58 V, the correct answer is not a smaller series count with a different nominal voltage; it is a different controller, a different chemistry, or a DC/DC architecture.

Cell configuration and derating

Step 3: Cell format and parallel count

Cell format Typical capacity Continuous current per cell Peak current per cell Use in AGV packs
D high-rate NiMH 8–10 Ah 5–10 A 15–20 A Workhorse for 24 V/48 V industrial packs
F high-rate NiMH 15–20 Ah 10–20 A 30–40 A Fewer parallel strings, heavier cells
Sub-C high-rate 2.5–3.5 Ah 4–8 A 10–15 A Compact auxiliary packs, not main traction
AA high-rate 1.2–2.0 Ah 2–5 A 5–8 A Sensors and small actuators only

For a 48 V 100 Ah pack using 10 Ah D cells, the configuration is 40S10P: 400 cells. That is a large, heavy pack. The parallel count is set by the required continuous current with margin, not by the capacity alone. If the AGV needs 50 A continuous and the D cell is rated 8 A continuous, 10P gives 80 A, which is a reasonable 1.6× margin. If the cell is rated 5 A, 10P gives only 50 A with no margin; use 12P or a larger cell.

Six-step NiMH pack sizing for warehouse AGVs and AMRs

Step 4: Capacity and runtime with derating

NiMH nameplate capacity is normally measured at a low rate, often 0.2C. An AGV discharges at 0.3–0.6C and sometimes higher. The delivered capacity is lower, the pack is warmer, and the cutoff arrives earlier because of voltage sag and cell imbalance.

Factor Illustrative value AGV-specific reason
Rate 0.85–0.95 0.3–0.6C average, higher peaks
Temperature 0.85–0.95 Warehouse 25–40 °C, pack internal rise
Age 0.80–0.90 End-of-life capacity loss
Cutoff / imbalance 0.90–0.95 40S string, weak cell, controller cutoff
Wiring / connector 0.92–0.97 I²R and contact resistance

A planning chain of 0.90 × 0.90 × 0.85 × 0.95 × 0.95 gives about 0.62. That is a reasonable starting point for a well-designed 48 V pack. The exact chain must be documented and validated by a discharge test at the real current, temperature and cutoff.

Step 5: Resistance, voltage sag and heat

Internal resistance is the hidden sizing variable. A 40S10P pack built from 25 mΩ cells has about 100 mΩ of cell resistance (40 × 25/10) plus 20 mΩ of wiring and connections, for about 120 mΩ. At 30 A the pack drops 3.6 V and dissipates 108 W; at 60 A it drops 7.2 V and dissipates 432 W.

Current Sag at 120 mΩ Heat at 120 mΩ Heat at 180 mΩ Design consequence
10 A 1.2 V 12 W 18 W Natural convection may suffice
20 A 2.4 V 48 W 72 W Cell spacing and Thermal path needed
30 A 3.6 V 108 W 162 W Forced air or heat spreader likely
60 A 7.2 V 432 W 648 W Peak only; connector and fuse must survive

The pack should not be the primary current limiter. The controller should limit motor current, the fuse should protect the wiring, and the connector should be rated for the peak with margin. The pack's resistance is a design input, not a protection strategy.

Step 6: Charging, thermal and mechanical design

  • Charging: constant current with negative delta-V, temperature rise or timer termination; charge temperature window stated; charger communicates with the pack where possible.
  • Full charge: periodic full charge is required for cell balancing and state-of-charge reset; do not run a NiMH pack in permanent partial charge.
  • Thermal: cell spacing, nickel strip cross-section, heat spreader, enclosure surface, and forced air if the continuous heat exceeds natural convection.
  • Mechanical: 40S10P D-cell pack mass can approach 80 kg; lifting points, cell holders, weld support and vibration endurance are structural requirements.
  • Environment: IP54 for typical warehouses, IP65 for wash-down, condensation control in cold stores, ESD-safe enclosure where required.
  • Service: replaceable modules, clear polarity, connector keying, and a charger that cannot be cross-connected to a different voltage.

Worked example: 48 V 100 Ah pack for a 500 kg AMR

Parameter Value Comment
Configuration 40S10P, 10 Ah D cells 400 cells, 48 V nominal
Nameplate energy 4.8 kWh 48 V × 100 Ah
Derating chain 0.62 Rate, temperature, age, cutoff, wiring
Usable energy 2.98 kWh 4.8 × 0.62
Average mission power 500 W Mixed cruise, idle, lift
Runtime 5.9 h 2.98 kWh / 500 W
Heavier mission 800 W More ramps and lift
Runtime at 800 W 3.7 h 2.98 kWh / 800 W
Pack mass about 80 kg Cells plus enclosure, illustrative

For an eight-hour shift at 500 W average, the usable energy must be about 4.0 kWh, so the nameplate must be about 6.45 kWh, or 48 V 134 Ah. A 48 V 150 Ah pack, 7.2 kWh nameplate and 4.46 kWh usable, gives about 8.9 hours at 500 W. The 100 Ah pack is a five-to-six-hour pack, not an eight-hour pack, unless the real average is lower or opportunity charging is available.

Chemistry comparison for the same 4.8 kWh pack

Attribute Sealed NiMH 48 V 100 Ah Li-NMC AMR pack 1.63 kWh Lead-acid 24 V 375 Ah
Nominal energy 4.8 kWh 1.63 kWh 9.0 kWh (24 V × 375 Ah)
Pack mass About 80 kg About 14 kg battery Several hundred kg with battery room practice
Energy per kg About 60 Wh/kg About 116 Wh/kg About 30–40 Wh/kg
Charging Periodic full charge; 4–8 h typical Opportunity charge; 10–90% in 52 min on MiR Charge 8 h charge plus 8 h rest, or swap
Cycle life Moderate; confirm cell data 3,000 cycles minimum on MiR250 Moderate; sensitive to depth and maintenance
Best AGV role 24 V cost-sensitive, legacy, wide-temperature New 24/7 high-utilization AMR Legacy fleet with battery room

The comparison is deliberately blunt. A NiMH pack that stores three times the energy of a MiR250 pack weighs about six times as much. That is acceptable in a 500 kg industrial platform with a fixed pack, and unacceptable in a compact AMR that depends on fast battery swap and low chassis height. The chemistry must fit the machine, not the other way around.

Common sizing errors

  • Sizing from the motor nameplate. The mission average and the ramp peak are different numbers.
  • Ignoring the 58 V full-charge window. A 40S NiMH pack is not a drop-in for every 48 V lithium controller.
  • Using nameplate Ah as usable Ah. The derating chain is typically 0.55–0.65.
  • Forgetting the house load. Lidar, sensors and radio can consume 30–80 W continuously.
  • Treating NiMH as an opportunity-charge pack. It needs a full charge and balancing; 24/7 fleets should plan a swap.
  • Testing only at 20 °C. Warehouses, cold stores and summer loading docks are not laboratories.
  • Designing the pack without a lifting plan. An 80 kg pack is a two-person or hoist job.

RFQ data sheet

Field Specification
Machine AMR / AGV / tugger / under-cart / fork / heavy platform
Payload and route Loaded mass, grade, ramp length, floor, lift height
Voltage Nominal, full charge, cutoff, controller absolute maximum
Loads Average power, peak current, duration, RMS current
Energy Shift hours, missions per hour, idle fraction
Charging Current, profile, window, swap method, rest period
Thermal Ambient, enclosure, airflow, continuous heat
Mechanical Mass, dimensions, lifting points, vibration, shock
Compliance ISO 3691-4, EN 1175, IEC 63115-1/-2, EMC, IP, transport

Conclusion

A NiMH AGV pack is sized at the intersection of mission energy, peak current and charge strategy. The six-step method makes the trade-offs visible: audit the mission, choose the voltage window, select the cell format and parallel count, derate the capacity, calculate resistance and heat, and design charging and mechanics together. The next paper maps the evidence needed to certify the pack and the truck.

Lastest News
Unlock the power of lithium batteries for lasting performance in handheld vacuum cleaners. Weijiang Li-on Battery leads the charge in innovation.
READ MORE
A NiMH battery pack is a collection of individual NiMH batteries connected in series or parallel to create a higher voltage or capacity battery.
READ MORE
REQUEST MORE DETAILS
Please fill out the form below and click the button to request more information about
Name*
Whatsapp/Phone
Email*
Message*
Professional battery factory, support OEM & ODM customization.
REQUEST MORE DETAILS
Please fill out the form below and click the button to request more information about
Company Name*
Email Address*
WhatsApp / Phone*
Message & Requirements*

Buyer fact sheet

Weijiang Power at a glance

Legal entityShenzhen Weijiang Battery Co., Ltd., trading as Weijiang Power
Founded2010, 16 years of NiMH battery manufacturing
FactoryHuizhou Shenzhou Super Power Technology Co., Ltd., Zhongkai High-tech Zone, Huizhou, Guangdong; 12,000 m2, 4 workshops
Capacity200,000 NiMH cells per day; 200+ staff including 11-20 R&D engineers and 10 QC inspectors
Product rangeNiMH cells A, AA, AAA, SC, C, D, 9V, F, Sub-C, 4/5AA, 2/3A; custom NiMH packs; chargers; button and alkaline cells
CertificationsCE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001:2015, ISO 14001, IATF 16949, IEC 62321, MSDS, UL, IEC 62133; 16 patents; UN38.3 applies only to lithium packs
Markets60+ countries, focus on Europe and the United States
Order termsNo strict MOQ on standard stock; OEM samples 7-15 days; standard production 7-12 days; custom packs 15-25 days
Medical NiMHEnglish medical NiMH page
German medical NiMH page

Quick answers for buyers

Who is Weijiang Power?
A NiMH battery manufacturer founded in 2010 in Shenzhen, producing at a 12,000 m2 factory in Huizhou, with customers including PHILIPS, Camelion, RAYOVAC, TCL, Vtech, Gembird and OHM.

What can Weijiang Power supply?
Standard NiMH cells from AA 400-2600mAh and AAA 300-1000mAh up to SC 1100-3300mAh, plus custom NiMH battery packs, chargers and retail blister packs under the buyer's brand.

Which certificates are available for EU and US buyers?
CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001, ISO 14001, IATF 16949, IEC 62321, MSDS, UL and IEC 62133, with 16 patents; UN38.3 applies only to lithium packs.

What is the minimum order and lead time?
Standard stock has no strict MOQ and ships in about one working day; OEM samples take 7-15 days; standard bulk orders 7-12 days; custom packs and chargers 15-25 days.

How do I get a sample or a quote?
Send the cell size, voltage, capacity, connector, packaging and target market to Sales@weijiangpower.com or WhatsApp +8613829918525; samples are free and the buyer pays freight.

Deeper reading: NiMH battery sourcing guide for EU and US buyers · EU battery regulation and NiMH compliance guide · Certification checklist · Full FAQ

Language versions: Deutsch · Français · Español

Last reviewed: 20 November 2026. Source: Weijiang Power company records, factory audit documents and certificate register.