The first question is not "what capacity", it is "what does the robot do for the other twenty-three hours". A ground robot's pack is sized by the mix of moving, working, watching and charging, and that mix is different for a trainer, a legacy EOD platform and an auxiliary sensor bus. This paper turns the class and load frame from Paper A into a sizing procedure, works three examples at NiMH-appropriate scale, and sets out the hot-swap architecture that makes a small pack behave like a larger one.
| Phase | Duration per shift | Average power | Energy | Notes |
|---|---|---|---|---|
| Moving on flat ground | h | W | Wh | Measure on the actual surface |
| Climbing or stair work | min | W | Wh | Short and peaky; check voltage sag |
| Arm or manipulator work | min | W | Wh | Bursts; connector heating |
| Compute and perception | h | W | Wh | Often continuous for the whole shift |
| Radio and video link | h | W | Wh | Higher during transmission |
| Watch / standby | h | W | Wh | Sleep current and wake-on-event |
Fill the table from a data-logging shunt on one representative shift, not from datasheet guesses. The total is the mission energy; the maximum column value is the peak that the connector, fuse and PCM must survive. If the watch phase is longer than the moving phase, expect the watch energy to dominate, and consider a separate small auxiliary pack rather than cycling the traction pack for a radio watch.
| Architecture | Nominal | Advantages | Penalties | Typical class |
|---|---|---|---|---|
| Single 24 V bus | 24 V | Matches legacy military and vehicle equipment; simple DC-DC | Higher current for the same power; thicker harness | Man-portable, small medium |
| Single 48 V bus | 48 V | Half the current; smaller connectors and FETs | New DC-DC for 24 V payloads; isolation practice | Medium and large |
| Dual-voltage pack | 12/24 V or 24/48 V | One pack serves two platforms; logistics simplification | Contactors or configuration switching; operator error risk | BB-390/U family |
| Dual-bay with ORing | Bus-defined | Hot-swap and redundancy | Inrush control, bay supervisor, matching pack voltage | Man-portable EOD |
A dual-voltage NiMH pack is a genuine convenience: the BB-390/U offers 12 V 9.0 Ah or 24 V 4.5 Ah from the same block. The convenience has a cost, because the lower-voltage configuration delivers the same energy at twice the current, and the connector and wiring must be rated for that. A 12 V mode that is used only for a low-power sensor is fine; a 12 V mode used for traction is a different thermal problem.
| Configuration | Nominal | Full charge | Cut-off | Typical use |
|---|---|---|---|---|
| 10S | 12.0 V | 14.5 V | 9.0 V | 12 V auxiliary, legacy 12 V mode |
| 20S | 24.0 V | 29.0 V | 18.0 V | 24 V traction and payload |
| 24S | 28.8 V | 34.8 V | 21.6 V | 28 V military bus approximation |
| 40S | 48.0 V | 58.0 V | 36.0 V | 48 V traction |
Two numbers need attention. A 20S pack reaches about 29 V at full charge, above a 24 V bus's usual 27.6 V float; the load must tolerate it or a DC-DC must be inserted. A 40S pack reaches about 58 V, which is above the 60 V safety threshold in many low-voltage definitions only by a small margin; insulation, creepage and connector rating become design issues rather than afterthoughts.
| Factor | Planning value | Applies when | Evidence to use |
|---|---|---|---|
| Temperature | 0.85 at 0 °C; 0.70 at −20 °C | Outdoor, unheated store | Datasheet capacity-temperature curve |
| Rate | 0.90 at 1C | Traction peaks above 0.5C | High-rate discharge curve |
| End of life | 0.85 | Fleet expected to reach 500 cycles | 80 % capacity definition |
| Wiring | 0.95 | Harness longer than 0.5 m or connector resistance significant | Measured voltage drop at rated current |
| Combined | ≈ 0.62 | Cold, high-rate, end-of-life duty | Product of the four factors |
The combined factor is deliberately conservative. A trainer that runs at 20 °C on a bench and is replaced at 300 cycles does not need 0.62; it might use 0.90. A field pack in a winter depot does. The point of listing the factors is that the reviewer can see which assumptions were made, and can challenge them individually.
| Usable energy target | NiMH pack mass (est.) | Lithium pack mass (est.) | Mass penalty | Practical consequence |
|---|---|---|---|---|
| 100 Wh | 1.5–2.0 kg | 0.7–1.0 kg | +0.8–1.0 kg | Acceptable on a trainer |
| 250 Wh | 3.5–5.0 kg | 1.6–2.4 kg | +1.9–2.6 kg | Noticeable on a man-portable platform |
| 500 Wh | 7.0–10.0 kg | 3.2–4.8 kg | +3.8–5.2 kg | Changes the handling and the centre of gravity |
| 1,000 Wh | 14–20 kg | 6.5–9.5 kg | +7.5–10.5 kg | Not viable for a man-portable robot |
The estimates assume 60–120 Wh/kg for sealed NiMH packs and 150–250 Wh/kg for lithium packs, including enclosure and protection. They are planning figures, not quotations. The point is that the penalty grows linearly with energy, so the case for nickel weakens as the mission energy rises.
Assume the trainer moves for 40 percent of a four-hour shift at 100 W average, and watches for 60 percent at 25 W. The mission energy is 0.4 × 4 × 100 + 0.6 × 4 × 25 = 160 + 60 = 220 Wh. At 24 V the raw capacity is 9.2 Ah. With the 0.62 stack the requirement is 14.8 Ah. Two 24 V 8 Ah packs give 384 Wh nominal and about 238 Wh derated, which covers the mission with a small margin and allows one bay to be swapped while the other carries the load. The mass penalty versus a 2590 lithium pair is real, and for a training platform it is acceptable; for a deployed platform it is not.
A secondary sensor and radio draw 20 W for two hours from a 12 V bus. The energy is 40 Wh, the raw capacity is 3.3 Ah, and the derated requirement is about 5.4 Ah. A 10S 6 Ah pack is adequate. The important design point is isolation: the auxiliary pack should have its own DC-DC and its own return, so that a traction stall does not brown out the radio and so that a radio fault does not trip the traction protection.
Two 24 V 8 Ah packs charged at 0.1C take 0.8 A each for 14–16 hours. The charger's output energy per pair is roughly 2 × 192 Wh × 1.2 / 0.8 ≈ 576 Wh, plus the charger's own quiescent draw. A depot with ten platforms needs twenty bays and a supply sized for the simultaneous worst case, or a sequenced charger that rotates bays. Sequencing is usually cheaper than upgrading the supply, and it also spreads the thermal load in the charging room.
| Function | Implementation | Failure if omitted |
|---|---|---|
| Inrush limiting | Pre-charge resistor or active hot-swap controller | Connector arcing and welded contacts |
| Reverse current blocking | ORing diodes or ideal-diode controller | One pack charges the other; unequal discharge |
| Bay detection | Presence switch or SMBus enumeration | System assumes a pack is present and cuts off |
| Sequencing | Supervisor prevents both bays empty under load | Unexpected shutdown during a swap |
| Matching | Same chemistry, voltage and state of charge | Circulating current between packs |
| Connector rating | Make/break current and cycle count specified | Contact wear and intermittent faults |
Hot-swap is a system property, not a connector property. The PackBot approach of two packs is instructive: the platform can run on one while the other is changed, and the supervisor knows which bay is active. A NiMH version of the same architecture works, provided the inrush controller is rated for the pack's short-circuit current and the connector is keyed to prevent a 12 V pack being inserted into a 24 V bay.
| Parameter | Formula or rule | Example: 24 V 8 Ah pack, 40 A stall |
|---|---|---|
| Continuous current | Average traction power / bus voltage | 100 W / 24 V ≈ 4.2 A |
| Peak current | Stall current per motor × number of motors | 2 × 20 A = 40 A |
| Connector rating | ≥ peak current, with make/break rating | 50 A connector, keyed |
| Fuse | Above peak for the stall duration, below harness ampacity | 50 A slow-blow, 200 ms hold |
| Harness | Voltage drop < 2 % at continuous current | 2.5 mm² for 4.2 A over 1 m |
| PCM over-current trip | Above fuse hold, below connector damage | 60 A trip, 100 ms delay |
| Inrush limiter | Energy absorbed during hot-swap | Pre-charge resistor sized for 1,000 µF bus capacitance |
Protection coordination is a chain: the PCM trips first for soft faults, the fuse clears hard faults, and the connector survives both. A pack that trips the PCM on every kerb has the wrong trip curve, not the wrong cells.


| Check | Frequency | Method | Acceptance |
|---|---|---|---|
| Open-circuit voltage | Every issue and return | DMM after 30 min rest | Within 0.3 V of the expected SOC band |
| Capacity | Every 50 cycles or quarterly | 0.2C discharge to 1.0 V/cell | ≥ 80 % of rated capacity |
| Charge termination | Quarterly | Observe −ΔV and temperature rise | Terminates before 45 °C cell temperature |
| Insulation | Quarterly | 500 V insulation tester | ≥ 10 MΩ |
| Connector and latch | Every issue | Visual and 10 mating cycles | No damage; latch retains |
| Housing and seal | Quarterly | Visual, desiccant indicator | No moisture; no cracks |
| Thermistor | Quarterly | Resistance at two temperatures | Within tolerance of the curve |
A depot that records these seven checks has a fleet it can sustain. A depot that records only "charged" has a fleet that fails one pack at a time, usually at the least convenient moment.
Size from the watch energy, not the traction energy. A 25 W watch for 20 hours is 500 Wh, more than many traction missions. Consider a separate small auxiliary pack for the radio and compute, leaving the traction pack disconnected.
Only if the supervisor prevents them from being paralleled and the platform can run on either alone. Paralleling a 4 Ah and an 8 Ah pack causes the smaller one to cycle deeper and fail early.
For traction power above roughly 2 kW, 48 V reduces current and harness mass. For a man-portable platform, 24 V remains the practical choice because the whole ecosystem of chargers, radios and payloads is built around it.
Roughly 1.5–2.5 times as much, depending on cell grade and pack construction. That is why NiMH is a sustainment and auxiliary choice rather than an endurance-critical main pack.
Plan for about 60–70 percent to protect cycle life, and run a full discharge and recharge every three months to break up stratification and let the charger see a genuine end-of-charge signal.
PackBot 510 specifications (dual BB-2590, 4–8 h, 6 kg power pod); TALON specifications (lead-acid standard, 8.5 h, lithium option); THeMIS specifications (1,630 kg, diesel-electric, 15 h / 1.5 h); BB-2590/U and BB-390/U specifications; IEC 61951-2 charge methods; IEC 62133-1 safety tests; UN 3496 transport. Worked-example arithmetic uses the stated assumptions and the 0.62 combined derating factor; it is illustrative, not a product guarantee.
Paper C — Testing and certifying sealed NiMH packs for unmanned ground vehicles: shock and vibration to MIL-STD-810, ingress, EMC, abuse testing to IEC 62133-1 and the UN 3496 transport route. Paper A covers the UGV classes and load profiles behind this sizing work.
Weijiang Power — sealed NiMH cells and packs for industrial support equipment.
OEM and custom configurations, with honest chemistry boundaries. Visit our product range or browse the full technical series.
Buyer fact sheet
| Legal entity | Shenzhen Weijiang Battery Co., Ltd., trading as Weijiang Power |
| Founded | 2010, 16 years of NiMH battery manufacturing |
| Factory | Huizhou Shenzhou Super Power Technology Co., Ltd., Zhongkai High-tech Zone, Huizhou, Guangdong; 12,000 m2, 4 workshops |
| Capacity | 200,000 NiMH cells per day; 200+ staff including 11-20 R&D engineers and 10 QC inspectors |
| Product range | NiMH cells A, AA, AAA, SC, C, D, 9V, F, Sub-C, 4/5AA, 2/3A; custom NiMH packs; chargers; button and alkaline cells |
| Certifications | CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001:2015, ISO 14001, IATF 16949, IEC 62321, MSDS, UL, IEC 62133; 16 patents; UN38.3 applies only to lithium packs |
| Markets | 60+ countries, focus on Europe and the United States |
| Order terms | No strict MOQ on standard stock; OEM samples 7-15 days; standard production 7-12 days; custom packs 15-25 days |
| Medical NiMH | Medical NiMH battery page |
Who is Weijiang Power?
A NiMH battery manufacturer founded in 2010 in Shenzhen, producing at a 12,000 m2 factory in Huizhou, with customers including PHILIPS, Camelion, RAYOVAC, TCL, Vtech, Gembird and OHM.
What can Weijiang Power supply?
Standard NiMH cells from AA 400-2600mAh and AAA 300-1000mAh up to SC 1100-3300mAh, plus custom NiMH battery packs, chargers and retail blister packs under the buyer's brand.
Which certificates are available for EU and US buyers?
CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001, ISO 14001, IATF 16949, IEC 62321, MSDS, UL and IEC 62133, with 16 patents; UN38.3 applies only to lithium packs.
What is the minimum order and lead time?
Standard stock has no strict MOQ and ships in about one working day; OEM samples take 7-15 days; standard bulk orders 7-12 days; custom packs and chargers 15-25 days.
How do I get a sample or a quote?
Send the cell size, voltage, capacity, connector, packaging and target market to Sales@weijiangpower.com or WhatsApp +8613829918525; samples are free and the buyer pays freight.
Deeper reading: NiMH battery sourcing guide for EU and US buyers · EU battery regulation and NiMH compliance guide · Certification checklist · Full FAQ