Introduction
Paper C: testing and certifying NiMH UGV packs. Four-level programme; MIL-STD-810 shock and vibration; drop and wash-down; the cold-charge prohibition; EMC with traction motors running; IEC 62133-1 abuse tests; UN 3496 transport; field failures that shape acceptance criteria.
Details

Testing and certifying sealed NiMH packs for unmanned ground vehicles

A robot pack lives a harder life than a laptop pack and is certified less often. It is dropped off a tailgate, driven over kerbs, washed with a hose, left in a vehicle overnight at −10 °C, and then expected to accept a full charge in the morning. The certification question is not whether the cells are good; it is whether the assembly, the interconnect, the connector and the protection survive that sequence and still terminate charge correctly. This paper sets out the test programme for a sealed NiMH UGV support pack, the standards that apply at each level, and the acceptance criteria that make the result auditable.

Key facts at a glance

  • Test the pack as it is installed. A cell certificate and a bench pack do not cover a harness, a connector, a housing and a charging bay.
  • Shock and vibration find the interconnect, not the cell. Most UGV pack failures after environmental testing are tab welds, busbar screws and connector retention.
  • Ingress testing must include the connector. A housing rated IP67 with an unprotected connector is an IP54 assembly at best.
  • Charge termination is a safety test, not a performance test. It belongs in the same programme as the abuse tests, with the production charger.
  • NiMH travels under UN 3496. A UGV pack does not need a lithium UN 38.3 summary, and requesting one wastes time and signals a copied specification.

The four-level test programme

Level Sample Purpose Standards Owner
Cell qualification Single cells, formed Capacity, cycle life, abuse tolerance IEC 61951-2, IEC 62133-1 Cell manufacturer
Pack qualification Assembled pack with PCM, fuse, thermistor, connector Protection coordination, environmental survival IEC 62133-1 pack tests, IEC 60068-2, IEC 60529 Pack assembler
Platform integration Pack installed in the robot Hot-swap, charge bay, EMC, thermal IEC 62368-1, MIL-STD-461, platform specification Robot integrator
Logistics qualification Packed for shipment Transport classification and packaging UN 3496, IATA DGR, IMDG Shipper

The levels answer different questions and should not be collapsed. A pack qualification report that does not name the charger, the harness length and the housing is incomplete for platform integration, and a platform test that used a laboratory charger does not qualify the production charger.

Shock and vibration

Test Standard Typical level for a UGV pack Duration Failure to look for
Transport vibration IEC 60068-2-6; MIL-STD-810 Method 514 10–55 Hz, 1 g sweep, three axes 2 h per axis Tab weld fatigue, screw loosening
Ground mobile vibration MIL-STD-810 Method 514, category 8 Application profile, often 5–500 Hz Per mission profile Busbar cracking, connector fretting
Handling shock IEC 60068-2-27; MIL-STD-810 Method 516 15 g, 11 ms, three axes 3 shocks per axis Cell displacement, fuse integrity
Drop IEC 62133-1; MIL-STD-810 Method 516 1 m onto concrete, pack level 3 drops, different faces Cracked housing, PCM damage
Stack drop Platform-specific Tailgate height, 0.6–0.9 m Per handling procedure Connector latch failure

Vibration testing should be run with the pack mounted as it is in the robot, including the bracket and the harness. A pack tested loose on a shaker table is a different mechanical system from one clamped in a chassis with a 1 m harness. The harness is a vibration contributor, not an accessory: it can whip, fatigue the connector and radiate the very noise that the EMC test is trying to measure.

Ingress and wash-down

Declared rating Test Typical UGV exposure Design consequence
IP54 Dust protected, splashing water Indoor trainer, light rain Gasketed housing, drip path
IP65 Dust tight, water jets Deck and field wash-down Sealed connector, jet-rated seal
IP67 Immersion 1 m, 30 min Flooded basement, ford Pressure-rated connector and seal
IP68 (declared) Continuous immersion at declared depth Submersible variant only Pressure test at depth with safety factor

Wash-down is the most common real exposure and the least often tested. A hose at 4–6 bar directed at the connector for a few minutes is harsher than the IPX5 jet in the standard, because the operator aims at the seal. Test the assembly with the connector mated and with it unmated, and inspect the inside of the housing for moisture after each test. A desiccant indicator inside the housing is a cheap and honest witness.

Temperature and charging window

Condition Typical requirement Test method Consequence if violated
Storage, cold −20 °C IEC 60068-2-1 cold soak Capacity loss; case brittleness
Operation, cold −20 °C discharge Cold chamber, rated load Voltage sag and early cut-off
Storage, hot +55 °C IEC 60068-2-2 dry heat Electrolyte loss, seal creep
Charge, cold limit No charge below 0 °C Chamber with charger Gassing, permanent damage
Charge, hot limit Charge derated above 40 °C; stop at 45 °C cell Thermocouple on hottest cell Thermal runaway risk
Thermal cycling −20 to +55 °C, 10 cycles IEC 60068-2-14 Condensation, seal fatigue

The cold-charge prohibition is absolute for NiMH. A charger that starts charging as soon as a pack is inserted, without a pack thermistor above 0 °C, will eventually charge a frozen pack left in a vehicle overnight. The fix is simple: the charger reads the thermistor and waits; the cost of the wait is a delayed shift, the cost of the violation is a failed pack.

EMC in a robot full of motors

Test Standard Source of interference What to check
Conducted emissions MIL-STD-461 CE102; EN 55011 Motor PWM and DC-DC Noise on the battery leads, 10 kHz–10 MHz
Radiated emissions MIL-STD-461 RE102; EN 55011 Switching converters, long harness Radiated field at 1 m
Conducted susceptibility MIL-STD-461 CS114/CS115/CS116 Radio transients, cable coupling PCM reset or false trip
Radiated susceptibility MIL-STD-461 RS103; IEC 61000-4-3 Radios on the platform Protection false trigger, display upset
ESD IEC 61000-4-2; MIL-STD-461 CS118 Operator contact with connector PCM latch-up, connector damage
Surge / burst IEC 61000-4-4 / -4-5 Relay and contactor switching Fuse nuisance operation

A passive NiMH pack does not generate emissions, but the pack is part of the return path and the pack's harness is an antenna. Test with the robot's own motors running, not with a resistive load. The most common finding is a PCM that resets during a motor stall because the supply dipped and the reset threshold was set too close to the cut-off voltage.

Abuse tests at pack level

Test Condition Acceptance Pack-specific concern
External short Short at the connector, 20 °C No fire, no explosion; fuse operates Fuse rating versus harness rating
Overcharge 0.1C for 24 h with protection bypassed on one sample No fire, no explosion; venting permitted within limits Thermistor placement and charge termination
Forced discharge One cell reversed in a string No fire, no explosion Cell-group voltage monitoring
Impact Drop 1 m, steel surface No fire, no explosion Housing crush and cell compression
Thermal abuse +70 °C soak No fire, no explosion Seal and vent path
Crush 13 kN or application-specific No fire, no explosion Vehicle rollover scenario

Abuse tests are performed on samples that are deliberately unprotected in one function, to prove the chemistry's tolerance. They are not a substitute for the protection design; they are evidence that the design has a margin when a protection function fails. A pack that passes abuse only because the PCM works has demonstrated the PCM, not the cells.

Transport and shipping

Mode Rule Classification Documentation
Air IATA DGR UN 3496, Class 9 Packing instruction; no UN 38.3 summary
Sea IMDG UN 3496, Class 9 Dangerous goods declaration where required
Road ADR UN 3496, Class 9 Transport document
Rail RID UN 3496, Class 9 Transport document

Two errors recur in UGV logistics. The first is attaching a lithium UN 38.3 summary to a nickel pack because the freight forwarder asked for "the battery test summary"; the correct response is a UN 3496 classification and the nickel packing instruction. The second is shipping a prototype pack as "equipment" without a classification at all. Both are paperwork failures that can ground a shipment, and neither is a cell-quality problem.

Test matrix and acceptance criteria

Sample Pre-test Tests Acceptance
Pack, 3 pcs Capacity check, 0.2C Vibration, shock, drop No structural damage; capacity ≥ 95 % of pre-test
Pack, 3 pcs Insulation and seal check IP54/65/67 per declaration, wash-down No moisture inside; insulation ≥ 10 MΩ
Pack, 3 pcs Thermistor calibration Cold, hot, thermal cycling Charge inhibits below 0 °C; termination above 45 °C
Pack, 3 pcs Protection verification Overcharge, short, forced discharge Protection operates; no fire or explosion
Pack, 3 pcs Baseline emissions CE102/RE102 with robot motors running Within limit; no PCM reset
System, 1 set Hot-swap procedure Swap under load, both bays No shutdown; no arcing; supervisor correct
System, 1 set Production charger Full charge, termination, trickle Terminates on −ΔV and temperature; no overcharge

Acceptance criteria must be numeric where possible. "No structural damage" should be expanded to a defined inspection: no cracked housing, no loose busbar, no displaced cell, connector latch intact, fuse continuity, thermistor resistance within tolerance. A test report that says "passed" without the inspection list is not evidence.

Four-level UGV test programme

Field failures and what they teach

  1. Connector latch wear. A pack swapped four times a day for a year sees 1,000 mating cycles; a connector rated for 500 is a scheduled failure. Specify the cycle count, not just the current rating.
  2. Tab weld fatigue after vibration. A weld that passes a pull test can still crack under 2 hours of 1 g sweep. Add a vibration check to the first-article inspection.
  3. Charge in a cold vehicle. The charger started at −5 °C and the pack vented. The thermistor interlock is the fix, and it must be tested in a chamber, not assumed.
  4. PCM reset during motor stall. The protection reset threshold was within 0.5 V of the cut-off; a stall dipped the bus and the PCM rebooted. Separate the logic supply from the power return.
  5. Water in the connector. The housing was IP67, the connector was not. Ingress testing at assembly level found it in one day.
Acceptance criteria and field failure loop

Frequently asked questions

Does a UGV NiMH pack need UN 38.3?

No. UN 38.3 is the lithium battery test summary. Nickel-metal-hydride packs ship under UN 3496 with the applicable packing instruction and transport document.

Which MIL-STD-810 methods apply?

Method 501 for temperature, 507 for humidity, 510 for sand and dust, 514 for vibration, 516 for shock, and 509 for salt fog if the platform is exposed to a marine environment. The method is a framework; the levels come from the platform's own environmental specification.

Can the pack be tested without the robot?

Pack-level tests can be run on a bench, but EMC, hot-swap and charge-bay tests need the platform and the production charger. A bench-only programme leaves the highest-risk integration failures untested.

What is the pass criterion after vibration?

No structural damage, no loose interconnect, capacity at least 95 percent of the pre-test value, insulation resistance at least 10 MΩ, and a functional check of the protection circuits. Visual inspection alone is not sufficient.

How many samples are needed?

Three packs per environmental test group is a practical minimum for a first article. Abuse tests are destructive and typically use three samples per test. A pilot lot of ten packs gives enough data to detect lot-to-lot variation without excessive cost.

Is a NiMH pack safe if it is over-discharged and left standing?

No. A deeply discharged NiMH pack can reverse a weak cell and, on recharge, heat locally. The low-voltage disconnect should be latching, and a pack that has been below 0.9 V per cell for weeks should be capacity-checked before reuse, not simply recharged.

Sources

IEC 61951-2 for sealed NiMH performance; IEC 62133-1 for nickel-system safety; IEC 60529 for IP codes; IEC 60068-2-1/-2/-6/-14/-27/-30/-52 for environmental testing; MIL-STD-810G/810H Methods 501, 507, 509, 510, 514, 516; MIL-STD-461 for CE102, RE102, CS114/115/116, RS103 and CS118; IEC 61000-4-2/-3/-4/-5 for EMC immunity; UN 3496, IATA DGR, IMDG, ADR and RID for transport. Test levels quoted are typical planning values; the platform or contract specification governs.

Next in this series

Paper A covers UGV classes and load profiles; Paper B covers selection, sizing, derating and hot-swap architecture. This paper closes the C12 set on sealed NiMH in unmanned ground vehicle support.

Weijiang Power — sealed NiMH cells and packs for industrial support equipment.
OEM and custom configurations, with honest chemistry boundaries. Visit our product range or browse the full technical series.

Lastest News
Unlock the power of lithium batteries for lasting performance in handheld vacuum cleaners. Weijiang Li-on Battery leads the charge in innovation.
READ MORE
A NiMH battery pack is a collection of individual NiMH batteries connected in series or parallel to create a higher voltage or capacity battery.
READ MORE
REQUEST MORE DETAILS
Please fill out the form below and click the button to request more information about
Name*
Whatsapp/Phone
Email*
Message*
Professional battery factory, support OEM & ODM customization.
REQUEST MORE DETAILS
Please fill out the form below and click the button to request more information about
Company Name*
Email Address*
WhatsApp / Phone*
Message & Requirements*

Buyer fact sheet

Weijiang Power at a glance

Legal entityShenzhen Weijiang Battery Co., Ltd., trading as Weijiang Power
Founded2010, 16 years of NiMH battery manufacturing
FactoryHuizhou Shenzhou Super Power Technology Co., Ltd., Zhongkai High-tech Zone, Huizhou, Guangdong; 12,000 m2, 4 workshops
Capacity200,000 NiMH cells per day; 200+ staff including 11-20 R&D engineers and 10 QC inspectors
Product rangeNiMH cells A, AA, AAA, SC, C, D, 9V, F, Sub-C, 4/5AA, 2/3A; custom NiMH packs; chargers; button and alkaline cells
CertificationsCE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001:2015, ISO 14001, IATF 16949, IEC 62321, MSDS, UL, IEC 62133; 16 patents; UN38.3 applies only to lithium packs
Markets60+ countries, focus on Europe and the United States
Order termsNo strict MOQ on standard stock; OEM samples 7-15 days; standard production 7-12 days; custom packs 15-25 days
Medical NiMHMedical NiMH battery page

Quick answers for buyers

Who is Weijiang Power?
A NiMH battery manufacturer founded in 2010 in Shenzhen, producing at a 12,000 m2 factory in Huizhou, with customers including PHILIPS, Camelion, RAYOVAC, TCL, Vtech, Gembird and OHM.

What can Weijiang Power supply?
Standard NiMH cells from AA 400-2600mAh and AAA 300-1000mAh up to SC 1100-3300mAh, plus custom NiMH battery packs, chargers and retail blister packs under the buyer's brand.

Which certificates are available for EU and US buyers?
CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001, ISO 14001, IATF 16949, IEC 62321, MSDS, UL and IEC 62133, with 16 patents; UN38.3 applies only to lithium packs.

What is the minimum order and lead time?
Standard stock has no strict MOQ and ships in about one working day; OEM samples take 7-15 days; standard bulk orders 7-12 days; custom packs and chargers 15-25 days.

How do I get a sample or a quote?
Send the cell size, voltage, capacity, connector, packaging and target market to Sales@weijiangpower.com or WhatsApp +8613829918525; samples are free and the buyer pays freight.

Deeper reading: NiMH battery sourcing guide for EU and US buyers · EU battery regulation and NiMH compliance guide · Certification checklist · Full FAQ

Language versions: Deutsch · Français · Español

Last reviewed: 20 November 2026. Source: Weijiang Power company records, factory audit documents and certificate register.