Sizing a ground-support pack is an exercise in honest arithmetic. The aircraft's flight energy is irrelevant; what matters is the ground mission the pack actually serves — how many sorties, how many amp-hours at what voltage, how cold the flight line gets, and how long the pack must last before it is replaced. This paper sets out a repeatable sizing procedure for sealed nickel-metal-hydride (NiMH) packs used in unmanned-aircraft ground support, test, launch, recovery and training equipment. It uses worked examples rather than rules of thumb, and it states the derating stack explicitly so that the resulting number can be defended.

Key facts at a glance

  • Start with an energy audit, not a voltage. List every load, its current, its duty cycle and its duration. A pack sized from a nominal voltage and a guessed ampere-hour rating will be wrong in one direction or the other.
  • NiMH cells are 1.2 V nominal. A 24 V bus uses 20 cells in series; a 12 V bus uses 10; a 28.8 V bus uses 24. The charge voltage is higher than the nominal, and the end-of-discharge voltage is lower.
  • Derate four times. Temperature, depth of discharge, end-of-life aging and rate/wiring losses multiply. A pack that measures 20 Ah at 25 °C may deliver 12–13 Ah at −15 °C after two years of service.
  • Charge termination is part of the pack. A sealed NiMH pack needs a defined charge method — constant current with −ΔV, dT/dt or a temperature ceiling — and a charger that implements it. A timer alone is not a charge control.
  • The transport route is simpler than lithium, not absent. Nickel-metal-hydride does not require a UN 38.3 test summary. By air it is Not Restricted under IATA Special Provision A199 when short-circuit and unintentional activation are prevented; by sea it is UN 3496, Class 9, with special provisions 117 and 963.

Step 1: the load audit

The load audit is a table, not a paragraph. For each load, record the voltage, the current in the worst realistic case, the duty cycle and the duration per sortie or per shift. Multiply current by time to get ampere-hours, and add a separate column for peak current that does not contribute to energy but does stress the pack.

Load Voltage Average current Duty / duration Ah per shift Peak current
Ground control station and display 12 V 4 A Continuous, 4 h 16 Ah at 12 V 6 A
Datalink and recorder 12 V 1.5 A Continuous, 4 h 6 Ah at 12 V 3 A
Launch controller 24 V 0.05 A standby 8 h standby, 48 × 2 s pulses at 10 A 0.4 Ah + 0.27 Ah 10 A for 2 s
Recovery winch control 24 V 2 A 10 min per recovery, 6 recoveries 2 Ah 25 A inrush
Battery test bench 24 V 3 A 2 h per shift 6 Ah 5 A
Lighting and communications 12 V 1 A 4 h 4 Ah 2 A

The audit should distinguish loads that share a bus from loads that have their own supply. Two 12 V loads at 4 A and 1.5 A are 5.5 A on one bus, not 5.5 A on two. It should also record which loads are safety-critical: a ground station that loses power during landing is a different requirement from a work light that goes dark.

Step 2: chemistry comparison

Property Sealed NiMH Li-ion (NMC/LFP) LiPo Primary LiSO2
Nominal cell voltage 1.2 V 3.6–3.7 V (LFP 3.2 V) 3.7 V 3.6 V
Gravimetric energy, cell level 80–120 Wh/kg 150–250 Wh/kg 150–250 Wh/kg 300–500 Wh/kg
Cycle life 500–1,000 500–1,000 300–500 Single use
Charge control −ΔV, dT/dt or temperature ceiling; tolerant of simple chargers CC/CV with per-cell monitoring and balancing CC/CV with balance and protection Not rechargeable
Cold capacity at −20 °C ≈ 50–70 % of 25 °C capacity ≈ 60–80 % ≈ 60–75 % Depends on cell design
Abuse tolerance Good; no thermal-runaway cascade in the lithium sense Requires protection and cell balancing Requires protection and careful packaging Not applicable
Transport UN 3496; no UN 38.3 summary UN 3480/3481; UN 38.3 summary UN 3480/3481; UN 38.3 summary UN 3090/3091 depending on configuration
Best fit in UAV support GSE, test, launch, recovery, training Flight packs, high-energy GSE Flight packs Single-mission devices

The comparison is not a scorecard. NiMH loses on energy density and wins on charge simplicity, abuse tolerance and transport paperwork. For a ground cart that is charged from a vehicle alternator and stored in a container, those wins are worth more than the kilograms. For a flight pack, they are not.

Step 3: cell count and voltage window

Bus Cells in series Nominal voltage Typical charge voltage End-of-discharge Use
6 V 5 6.0 V 7.0–7.5 V 5.0 V Legacy instruments, small test sets
12 V 10 12.0 V 14.0–15.0 V 10.0 V Ground station, lights, hand-held controllers
14.4 V 12 14.4 V 16.8–18.0 V 12.0 V 12S-equivalent training airframes
24 V 20 24.0 V 28.0–30.0 V 20.0 V GSE cart, winch, launch compressor
28.8 V 24 28.8 V 33.6–36.0 V 24.0 V 28 V avionics and military GSE

Two practical rules follow. First, the pack voltage must stay inside the load's input window at end-of-discharge and at end-of-charge, not just at nominal. Second, the charger's output must match the cell count; a 20-cell pack charged by a 10-cell charger will be chronically undercharged, and a 10-cell pack charged by a 20-cell charger is a fire risk. The connector should be keyed so that the two cannot be interchanged.

Step 4: worked example — a 24 V ground-support cart

Consider a cart that must run a ground control station, a datalink and a test bench for four hours between charges. The audit gives 3 A average at 24 V, with a 10 A peak when the winch starts. The required delivered energy is:

E = 24 V × 3 A × 4 h = 288 Wh      Ah = 3 A × 4 h = 12 Ah

Apply the derating stack: 80 % depth of discharge, 90 % end-of-life aging, 90 % temperature at the lowest expected operating temperature, and 95 % wiring/rate loss. The combined factor is 0.8 × 0.9 × 0.9 × 0.95 = 0.616. The required nameplate capacity is 12 / 0.616 = 19.5 Ah. Select a 24 V 20 Ah pack (20 cells, 20 Ah), which gives 480 Wh nominal and about 296 Wh usable under the stated conditions. The 10 A peak is 0.5C, comfortably inside a 1C continuous rating; the 25 A winch inrush is 1.25C for less than a second, which the pack can supply if the connector and fuse are rated for it.

Quantity Value Basis
Average load 3 A at 24 V Load audit
Mission duration 4 h Requirement
Delivered capacity 12 Ah 3 A × 4 h
Depth of discharge 80 % Cycle-life policy
End-of-life aging 90 % 2-year service target
Temperature 90 % −10 °C operating floor
Wiring and rate 95 % Cabling, connector, Peukert
Combined factor 0.616 Product of the four
Required nameplate 19.5 Ah 12 / 0.616
Selected pack 24 V 20 Ah, 20 cells Next standard size

Step 5: worked example — a launch controller

A launch controller is a pulse load with a long standby. The audit is 50 mA standby for eight hours and 48 pulses of 10 A for two seconds. The energy per pulse is 10 A × 2 s = 5.56 mAh; 48 pulses are 0.27 Ah. Standby is 0.05 A × 8 h = 0.4 Ah. Total delivered is 0.67 Ah. Even with a 0.5 derating factor, a 2 Ah pack is sufficient on energy. The design driver is not energy but voltage sag and cold performance: a small 2 Ah pack at −20 °C may drop below the controller's brown-out threshold during a 10 A pulse. A 5 Ah pack, or a 2 Ah pack with a supercapacitor buffer, is the safer choice.

Load element Current Duration Delivered charge
Standby 50 mA 8 h 0.40 Ah
Launch pulse 10 A 2 s × 48 0.27 Ah
Total — — 0.67 Ah
Selected pack — — 5 Ah, 20 cells, 10 A continuous / 30 A pulse

Step 6: the derating stack in full

Factor Typical multiplier What it represents How to verify
Depth of discharge 0.80 Keeping 20 % reserve for cycle life and unexpected loads Cycle-life test at the intended DoD
Temperature 0.70–0.95 Capacity loss at cold; derating at high temperature for life Discharge at the lowest and highest operating temperature
End-of-life aging 0.85–0.90 Capacity fade at the replacement point Cycle-life data to 80 % capacity
Rate / Peukert 0.90–0.95 Capacity reduction at higher discharge rates Discharge curve at the actual rate
Wiring and connector loss 0.95 Voltage drop and contact resistance Measure at the pack terminals under load
Self-discharge / storage 0.90–0.95 Loss between charge and use Storage test at the intended temperature

The multipliers compound. A pack with a 0.8 DoD, 0.85 end-of-life, 0.9 cold and 0.95 wiring factor has a combined usable fraction of 0.58. That is why a 20 Ah nameplate often behaves like a 12 Ah pack in the field. The number is not a defect; it is the price of a pack that survives the mission and the warranty period.

NiMH cell string and derating stack

Step 7: charging and termination

Method Rate Termination Use / caution
Standard overnight 0.1C Timer 14–16 h plus temperature ceiling Bench and depot; simplest, slowest
Fast charge 0.3–1C −ΔV of 5–10 mV per cell, or dT/dt, plus absolute temperature cut-off Field charger; requires a matched charger and thermistor
Trickle / maintenance 0.03–0.05C Timer or temperature; never indefinite at high rate Standby systems; overcharge heats and dries the cell
Opportunity charging 0.2–0.5C Partial charge, terminate on temperature or voltage Vehicle or generator; accept partial state of charge

Sealed NiMH cells do not tolerate indefinite trickle charge at a high rate. The charger should implement a primary termination (voltage drop or temperature rise), a backup timer, and a temperature ceiling. The pack should include a thermistor in thermal contact with the cells, and the charger should refuse to charge below 0 °C or above the specified maximum. A pack without a thermistor is a pack that depends on the operator to notice it getting hot.

Step 8: protection and pack architecture

Element Function Typical specification Failure mode if omitted
Thermistor Charge and discharge temperature sensing 10 kΩ NTC at 25 °C, mounted on cells Overcharge or thermal runaway of the charger
Fuse Short-circuit and reverse-polarity protection Blade fuse or resettable PTC rated above pulse current Connector weld, cable fire
Low-voltage cutoff Prevent cell reversal 1.0 V per cell under load, 1.1 V rest Reversed cell, permanent capacity loss
Overcurrent / short protection Limit external fault current Electronic or fuse, 2–3× continuous rating Welded contacts, melted insulation
Connector keying Prevent wrong voltage or polarity Different keying for 10-cell and 20-cell packs Charger mismatch, immediate damage
Enclosure and vent Ingress and pressure equalization IP54–IP65, vented or sealed with a pressure-equalizing membrane Condensation, corrosion, case distortion

A 20-cell 24 V pack does not need per-cell balancing electronics in the way a lithium pack does, but it does need a pack-level cutoff and a fuse. The absence of a balancing BMS is a cost advantage only if the charger and the pack are designed as a pair; it is not a licence to omit protection.

Step 9: mechanical and environmental design

Requirement Typical choice Test / evidence
Enclosure ABS or PC/ABS, flame-retardant, 2–3 mm wall Drop, impact, UL 94 V-0 material data
Ingress IP54 for sheltered GSE; IP65 for flight line; IP67 for exposed carts IEC 60529 dust and water tests
Vibration Cell immobilization, potting or structural ribs MIL-STD-810H Method 514.8, tailored profile
Shock Mounting bracket and crush space MIL-STD-810H Method 516.8, handling drop
Temperature Cell spacing, thermal path, charge inhibit below 0 °C MIL-STD-810H Methods 501.7 / 502.7 or application profile
Altitude Pressure-equalizing vent if the pack is air-shipped or stored at altitude MIL-STD-810H Method 500.6, if applicable

Three reference configurations

Application Configuration Energy Continuous / pulse Charge Notes
Ground-support cart 20S 20 Ah (24 V) 480 Wh nominal, ≈ 296 Wh usable 20 A / 40 A 2 s 0.2C, 6 h IP54, 10 kΩ NTC, 30 A fuse, Anderson connector
Launch controller 20S 5 Ah (24 V) 120 Wh nominal, ≈ 74 Wh usable 10 A / 30 A 2 s 0.3C, 4 h Cold-rated, keyed connector, low-voltage cutoff
Ground station backup 10S 12 Ah (12 V) 144 Wh nominal, ≈ 89 Wh usable 6 A / 12 A 0.2C, 6 h Deep-cycle, 2-year service target, IP54

These are reference points, not catalogue items. The purpose is to show the arithmetic and the architecture, so that a customer's requirement can be mapped onto a configuration rather than guessed.

Ground-support pack sizing and derating

What to ask before quoting a UAV ground-support pack

Question Why it matters Typical answer
What is the average and peak current? Sets cell size, tab, fuse and connector 3–20 A average, 10–60 A pulse
How long must the pack run between charges? Sets ampere-hours and charge logistics 2–8 h, one shift
What is the lowest and highest temperature? Sets usable capacity and charge inhibit −20 to +55 °C
What is the intended service life? Sets end-of-life derating and cycle target 2–3 years, 300–500 cycles
Is the pack charged from mains, vehicle or generator? Sets charger input and charge rate 24 V vehicle or 230 V generator
What ingress and drop does it see? Sets enclosure and mounting IP54–IP65, 1 m drop
What transport mode and quantity? Sets UN 3496 packing and documentation Road and air, small quantities

A one-page specification template

Field Example entry
Application and bus UAV ground-support cart, 24 V DC
Chemistry Sealed NiMH, 20 cells in series
Nominal energy / capacity 480 Wh / 20 Ah
Continuous / pulse current 20 A / 40 A for 2 s
Usable energy at −10 °C ≥ 250 Wh
Charge method 0.2C constant current, −ΔV and dT/dt, 0–40 °C
Protection 30 A fuse, low-voltage cutoff at 1.0 V/cell, NTC, keyed connector
Ingress / mechanical IP54, 1 m drop, MIL-STD-810H vibration tailored
Transport UN 3496, state of charge 30–50 %
Documentation Test report, UN 3496 statement, charging instructions, SDS

Frequently asked questions

Can a 24 V NiMH pack replace a 24 V lithium pack directly?

Only if the load's voltage window, charge profile, connector and protection scheme are all compatible. A 20-cell NiMH pack charges to about 28–30 V and discharges to about 20 V; a 7S lithium pack charges to 29.4 V and discharges to about 21 V. The nominal voltages match, but the current limits, charge termination and transport rules do not.

How many cells are in a 24 V NiMH pack?

Twenty cells in series at 1.2 V nominal each. The charge voltage is roughly 28–30 V and the end-of-discharge is roughly 20 V. A 28.8 V military bus uses 24 cells; a 12 V bus uses 10 cells.

Why derate for end-of-life if the pack is new?

Because the requirement is usually a service life, not a first-day performance. A pack that delivers 20 Ah when new but only 16 Ah at the two-year replacement point will fail the mission in its second year unless the initial capacity is selected with that fade in mind.

Is a balancing BMS required for a NiMH pack?

Not in the same sense as lithium. NiMH cells tolerate overcharge and can be equalized by a controlled overcharge, but the pack still needs a thermistor, a fuse, a low-voltage cutoff and a charger designed for the cell count. The absence of per-cell balancing electronics is not the same as the absence of protection.

What happens if a NiMH pack is overcharged?

Sealed cells recombine oxygen internally at moderate overcharge rates, which is why a controlled trickle is possible. At high rates or high temperature, pressure rises, electrolyte is lost and the cell dries out. That is why the charger needs a primary termination and a temperature ceiling, not just a timer.

Does a NiMH ground-support pack need UN 38.3?

No. UN 38.3 applies to lithium cells and batteries. Nickel-metal-hydride batteries do not require a UN 38.3 test summary. By air they are Not Restricted under IATA Special Provision A199 when short-circuit and unintentional activation are prevented; by sea they are UN 3496, Class 9, with special provisions 117 and 963. The pack should be shipped at 30–50 % state of charge and with the terminals protected against short circuit.

Sources

IEC 61951-2:2017+AMD1:2022, Secondary cells and batteries containing alkaline or other non-acid electrolytes — Secondary sealed cells and batteries for portable applications — Part 2: Nickel-metal hydride; IEC 62133-1:2017, Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for portable sealed secondary cells, and for batteries made from them, for use in portable applications — Part 1: Nickel systems; IEC 60529:1989+AMD1:2013+AMD2:2013, Degrees of protection provided by enclosures (IP Code); UN Manual of Tests and Criteria, Part III, subsection 38.3 (lithium batteries) and the UN 3496 entry for nickel-metal-hydride batteries; ASTM F3005-22, Standard Specification for Batteries for Use in Small Unmanned Aircraft Systems (sUAS); MIL-STD-810H, Methods 500.6, 501.7, 502.7, 514.8 and 516.8; DJI Matrice 300 RTK and Matrice 350 RTK published battery and battery-station specifications. Worked examples are illustrative calculations, not test data.

Next in this series

Paper C — Testing and certifying sealed NiMH packs for UAV ground support: IEC 61951-2 cell tests, IEC 62133-1 pack tests, IEC 60529 ingress, MIL-STD-810H environmental sequences, MIL-STD-461G EMC and the UN 3496 transport route.

Weijiang Power — sealed NiMH cells and packs for industrial support equipment.
OEM and custom configurations, with honest chemistry boundaries. Visit our product range or browse the full technical series.

Lastest News
Unlock the power of lithium batteries for lasting performance in handheld vacuum cleaners. Weijiang Li-on Battery leads the charge in innovation.
READ MORE
A NiMH battery pack is a collection of individual NiMH batteries connected in series or parallel to create a higher voltage or capacity battery.
READ MORE
REQUEST MORE DETAILS
Please fill out the form below and click the button to request more information about
Name*
Whatsapp/Phone
Email*
Message*
Professional battery factory, support OEM & ODM customization.
REQUEST MORE DETAILS
Please fill out the form below and click the button to request more information about
Company Name*
Email Address*
WhatsApp / Phone*
Message & Requirements*

Buyer fact sheet

Weijiang Power at a glance

Legal entityShenzhen Weijiang Battery Co., Ltd., trading as Weijiang Power
Founded2010, 16 years of NiMH battery manufacturing
FactoryHuizhou Shenzhou Super Power Technology Co., Ltd., Zhongkai High-tech Zone, Huizhou, Guangdong; 12,000 m2, 4 workshops
Capacity200,000 NiMH cells per day; 200+ staff including 11-20 R&D engineers and 10 QC inspectors
Product rangeNiMH cells A, AA, AAA, SC, C, D, 9V, F, Sub-C, 4/5AA, 2/3A; custom NiMH packs; chargers; button and alkaline cells
CertificationsCE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001:2015, ISO 14001, IATF 16949, IEC 62321, MSDS, UL, IEC 62133; 16 patents; UN38.3 applies only to lithium packs
Markets60+ countries, focus on Europe and the United States
Order termsNo strict MOQ on standard stock; OEM samples 7-15 days; standard production 7-12 days; custom packs 15-25 days
Medical NiMHMedical NiMH battery page

Quick answers for buyers

Who is Weijiang Power?
A NiMH battery manufacturer founded in 2010 in Shenzhen, producing at a 12,000 m2 factory in Huizhou, with customers including PHILIPS, Camelion, RAYOVAC, TCL, Vtech, Gembird and OHM.

What can Weijiang Power supply?
Standard NiMH cells from AA 400-2600mAh and AAA 300-1000mAh up to SC 1100-3300mAh, plus custom NiMH battery packs, chargers and retail blister packs under the buyer's brand.

Which certificates are available for EU and US buyers?
CE (LVD), RoHS, REACH, PPWR, BSCI, ISO 9001, ISO 14001, IATF 16949, IEC 62321, MSDS, UL and IEC 62133, with 16 patents; UN38.3 applies only to lithium packs.

What is the minimum order and lead time?
Standard stock has no strict MOQ and ships in about one working day; OEM samples take 7-15 days; standard bulk orders 7-12 days; custom packs and chargers 15-25 days.

How do I get a sample or a quote?
Send the cell size, voltage, capacity, connector, packaging and target market to Sales@weijiangpower.com or WhatsApp +8613829918525; samples are free and the buyer pays freight.

Deeper reading: NiMH battery sourcing guide for EU and US buyers · EU battery regulation and NiMH compliance guide · Certification checklist · Full FAQ

Language versions: Deutsch · Français · Español

Last reviewed: 20 November 2026. Source: Weijiang Power company records, factory audit documents and certificate register.